Challenges
- Authenticity: Achieving the authentic Crittall look, which the previous installation could have accomplished, posed a significant challenge. This required meticulous attention to detail in the design and manufacturing of the new glazing units to ensure they matched the traditional style.
- Structural Integrity: The property featured timber subframes that needed to be preserved and integrated with the new installation without compromising the structural integrity of the building.
- Volume and Scale: The project entailed the replacement of 111 individual windows and three sets of double doors, and one arched head Crittall window a substantial volume that demanded precise planning and coordination.
- Time Constraints: Completing the installation within a tight three-week timeframe required efficient project management and coordination with various stakeholders.